The completed project scope includes upgrades to five lift stations and a force main, added mechanical fine screen, enhanced biological nutrient removal (EBNR), extended aeration to the oxidation ditch, final clarifiers, UV disinfection, sludge pumping, sludge thickening, aerobic digestion, sludge storage and a state-of-the-art SCADA system. The approved plan provides accommodations for 20-year growth, while providing operational flexibility in the interim. During the planning phase, MSA worked closely with the Ho-Chunk Nation to better understand the timing and breadth of growth plans for its commercial enterprises. In order to accommodate future growth as well as protect the water quality of the Black River, they needed a long-term, cost-effective solution-one that upgraded the existing Oxidation Ditch facility to address stringent secondary treatment and nutrient removal requirements.Ī $9.5 million expansion was designed to meet both existing and future permit requirements and to accommodate the imminent growth of the Ho-Chunk Nation. Projected growth in the area, including an expansion for Majestic Pines Casino, meant the Ho-Chunk Nation was facing its third major upgrade to the treatment facility in 15 years. ![]() The Wazee Area Wastewater Treatment Facility (WWTF) provides water reclamation for the Ho-Chunk Nation residential and commercial entities as well as the Jackson County Correctional Institute.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |